- Mechanical excavation of material for the newly designed road with channels for atmospheric drainage, approx. 8,000 m3
- Pouring sand and gravel in layers
- Installation of road curbs approx. 1,500m
- Asphalting of the roadway – 4,500m2
- Construction of concrete sidewalks along the road 1350m
Construction of road with accompanying infrastructure, “South East II-B” work zone – Zrenjanin

