- Mechanical excavation of material for the newly designed road with channels for atmospheric drainage, approx. 8,000 m3
- Pouring sand and gravel in layers
- Installation of road curbs approx. 1,500m
- Asphalting of the roadway – 4,500m2
- Construction of concrete sidewalks along the road 1350m
Concrete and asphalt production
Production of concrete products
Gravel pit and gravel separation
- Copyright 2024 - EkoGradnja DOO
- Powered by: Studio DI MANO - Place of new ideas