- Mechanical excavation of material with scarping of channel walls
- Mechanical backfilling and planning of pits in the channel and side walls
- Mechanical laying of prefabricated concrete blocks approx. 2,500m2
Concrete and asphalt production
Production of concrete products
Gravel pit and gravel separation
- Copyright 2024 - EkoGradnja DOO
- Powered by: Studio DI MANO - Place of new ideas