Construction of road with accompanying infrastructure, “South East II-B” work zone – Zrenjanin

  • Mechanical excavation of material for the newly designed road with channels for atmospheric drainage, approx. 8,000 m3
  • Pouring sand and gravel in layers
  • Installation of road curbs approx. 1,500m
  • Asphalting of the roadway – 4,500m2
  • Construction of concrete sidewalks along the road 1350m